Patuxent River New Conference & Catering Center

Construction Projects

Patuxent River New Conference & Catering Center

Location: Patuxent River, Md.

Complete: 2010

Size: 28,500 sq. ft.

Total Site: 49 acres

CECA LLC was responsible for all phases of the electrical construction for this new facility including the purchase and installation of a 500kva utility transformer. Interior work included, but not limited to a full commercial kitchen wiring, Hinkley Lighting 3 tier chandeliers in multipurpose room and Fire Alarm/Mass Notification Systems. Exterior work includes installing 25’ AERIS luminaires on 3’ concrete bases throughout entrance and parking areas. Decorative Stone Bollard lighting complements the view from the river.

« Back To Our Work

Page:
(To visit this page click the title)

Lighting Retro-Fit

Construction Projects

Lighting Retro-Fit

Various Locations:

US Naval Academy

Maryland Stadium Authority – Camden Yards

Schaefer Towers

Prince George’s Public Schools

Baltimore Public Schools

And more …

CECA LLC recognizes the need for energy conservation. We are activity involved with BGE, PEPCO Energy Service, Johnson controls and others in rebates programs and performance contracts to significantly reduce electrical consumption in facilities throughout DC Metropolitan Area. We specify and install the latest lighting technologies utilizing T-8,T-5 and LED lamps, electronic Ballasts and occupancy sensors to achieve energy reduction goals.

« Back To Our Work

Page:
(To visit this page click the title)

Hil Mar Condos

Architectural/Engineering Projects

Hil Mar Condos

Location: Largo, Maryland
Size: 108 Units
Project Type: Renovation
Construction Cost: .75 million

Completed: Fall 2006

The renovation of the 1965 Apartment Complex gave life to a new Condominium Complex, designed for young growing families and busy professionals. Each unit features hardwood floors, with updated open kitchen with wood cabinets, stainless steel appliances, ceramic tile floor and counter backsplash, ceramic tile bathroom floor and shower walls, carpeted bedrooms and utility room with washer and dryer appliances.

« Back To Our Work

Page:
(To visit this page click the title)

TEMPLE OF PRAISE BAPTIST CHURCH

Architectural/Engineering Projects

TEMPLE OF PRAISE BAPTIST CHURCH

Location: Washington, District of Columbia

GROSS SQUARE FEET: 28,400 sq. ft.
SITE: 5.6 acres
PROJECT TYPE: New Construction
CONSTRUCTION COST: Entire Project: 5.2 million
Work for which Firm was/is responsible: 5.2 million

CONSTRUCTION DATE: 04/03

CECA, LLC is responsible for A/E designing Temple of Praise Baptist Church located in Washington, D.C. This 28,400 square foot church consists of a 1300-seat sanctuary; over 1,500 sq.ft. of office space; over 2,000 sq.ft. of meeting room space; a fellowship hall; full audio/video capabilities; a bookstore and more.

PRINCIPAL IN CHARGE:
L. Terry Carnes

PROJECT MANAGERS:
Naresh Shah & Lawrence Turner

PROJECT DESIGNER:
Ed Canino

« Back To Our Work

Page:
(To visit this page click the title)

FIRST BAPTIST CHURCH OF GLENARDEN

Architectural/Engineering Projects

FIRST BAPTIST CHURCH OF GLENARDEN

Location: Landover, Maryland

GROSS SQUARE FEET: 205,000 sq. ft.
SITE: 83 acres
SANCTUARY CAPACITY: 4000 seats
PROJECT TYPE: New Construction
CONSTRUCTION COST: 62 million
CECA LLC was responsible: 35 Million

COMPLETION DATE: Fall 2007

CECA, LLC, teaming with the design firm of HH Architects, Texas, is responsible for MP & E, design and the Architectural Construction Documents for the First Baptist Church of Glenarden located in Landover, Maryland. This 205,000 square foot church consists of a 4,000-seat sanctuary, over 1,300 sq.ft. of office space, 44 classrooms, 6 multi-purpose rooms; choir rehearsal and practice rooms, full audio/video capabilities and more.

PRINCIPAL IN CHARGE – ARCHITECT:
Lawrence Turner – CECA LLC

PROJECT MANAGERS:
Cynthia Hamlin – CECA LLC

DESIGN ARCHITECT:
HH Architects

« Back To Our Work

Page:
(To visit this page click the title)

REID TEMPLE A.M.E. CHURCH

Architectural/Engineering Projects

REID TEMPLE A.M.E. CHURCH

Location: Glenn Dale, Maryland

GROSS SQUARE FEET: 134,500 sq. ft.
SITE:28 acres
SANCTUARY CAPACITY: 3000 seats
PROJECT TYPE: New Construction
CONSTRUCTION COST:
Entire Project: 25 million
Work for which Firm was/is responsible: 18 mil.

CONSTRUCTION DATE: 3/03

CECA, LLC is responsible for A/E designing Reid Temple A.M.E. Church.  Located in Glenn Dale-Maryland, this 134,500 square foot church facility consists of a 3000-seat sanctuary; over 5,000 sq.ft. of office space; over 7,000 sq.ft. of meeting room space; 16 classrooms; full audio/video capabilities; 2 nurseries; a bookstore; a credit union and more.

PRINCIPAL IN CHARGE – ENGINEER:
L. Terry Carnes

PROJECT ARCHITECT:
Edward Canino

PROJECT MANAGER:
Kevin Louers

« Back To Our Work

Page:
(To visit this page click the title)

MONARCH ACADEMY SCHOOL

Architectural/Engineering Projects

MONARCH ACADEMY SCHOOL

Location: Glen Burnie, Maryland

GROSS SQUARE FEET: 25,400sq. ft.
PROJECT TYPE: Interior Renovation/Use Change
CONSTRUCTION COST: 2.0 million
CONSTRUCTION START DATE: Summer 2009

CECA, LLC is responsible for Mechanical, Electrical, and Plumbing engineering design’s of the Glen Burnie, Maryland Campus of the Monarch Academy Public Charter School. The school’s mission is to educate all students to be self-motivated, creative, critical thinkers and life-long learners who are productive contributors to the global community in the 21st century. Monarch Academy is a place where children are encouraged to think critically, to question, reflect and participate in a rigorous, highly interactive instructional program that integrates arts and technology across the curriculum.

PRINCIPAL IN CHARGE:
L. Terry Carnes, P.E.

PROJECT MANAGER:
Dennis Anibaba, P.E.

DESIGN ARCHITECT:
R. M Sovich Architecture

« Back To Our Work

Page:
(To visit this page click the title)

THE CHILDREN’S GUILD SCHOOL

Architectural/Engineering Projects

THE CHILDREN’S GUILD SCHOOL

Location: Glen Burnie, Maryland

GROSS SQUARE FEET: 17,746 sq. ft.
PROJECT TYPE: Interior Renovation/Use Change
CONSTRUCTION COST: 1.2 million
CONSTRUCTION START DATE: Summer 2009

CECA, LLC is responsible for A/E design of the Glen Burnie, Maryland Campus of the Children’s Guild School. The unique teaching environment serves the emotionally disturbed child through exploring and discovering. The teaching style of the school dictates a fun and mesmerizing interior design with lots of symbolic themes and colors, this 17,746 square foot interior renovation consist of 6 classrooms, Music Room, Art Room, Library, Cafeteria and Multi-purpose room.

PRINCIPAL IN CHARGE:
L. Terry Carnes, P.E.

PROJECT MANAGER:
Dennis Anibaba, P.E.

PROJECT ARCHITECT:
Cynthia Hamlin

« Back To Our Work

Page:
(To visit this page click the title)

EYA

Inspection Projects

EYA

Location:
Complete:

« Back To Our Work

Page:
(To visit this page click the title)

The Boulevard At The Capital Center

Inspection Projects

The Boulevard At The Capital Center

Location: Largo, Maryland
Complete: 2003

CECA, LLC, provided General Building, Electrical and Mechanical Commercial Inspections Services for both Base buildings and Tenant Build outs

The 85 million dollar open-air shopping center located on the site of the former Capital Centre features a Main Street Theme and covers approximately 55 acres on the Washington Beltway. The facility has more than 70 establishments housed in 490,000 square feet.

« Back To Our Work